Deliverability
Capacity that can’t reach your load under the region’s rules can’t enable it. Proving it takes detailed power-flow studies.
Firma delivers portfolios of clean, quiet, load-enabling power over the wires to data centers. We identify the best mix of ready-to-build, grid-connected resources in minutes, not months, and supply power under bring-your-own-capacity tariffs to secure utility power faster, cheaper, and simpler.
Clean quiet power communities can love.
Utilities are rushing to add supply for an unprecedented wave of new large loads. Many now let large customers bring their own capacity, so new load connects sooner and existing customers are protected from rate impacts. Bring-your-own-capacity (BYOC) rules have rapidly gone from novelty to norm and are now the fastest path to reliable grid power.
We're the first company purpose-built to deliver portfolios of clean, quiet, load-enabling power over the wires to meet utility BYOC requirements and get data centers connected faster, simpler and cheaper than alternatives like behind-the-meter gas.
Onsite gas is a hard path, with long waits for turbines and complex operations. Noisy and polluting generators can destroy community support. Clean quiet power delivered over the wires avoids both.
More than 90% of new U.S. power projects in development are wind, solar and storage. Combined in the right mix, these projects can serve tens of gigawatts of new large loads before 2030. The hard part isn’t cost, speed or reliability. It’s assembling enough clean power from a patchwork of projects. Three barriers have kept that from happening.
Firma’s Portfolio Capacity Agreements are the solution to all three.
FirmaOS designs the supply. Firma Supply delivers it.
The first software suite purpose-built for the bring-your-own-capacity era. Capacity enables new load only if it passes four tests, and FirmaOS designs portfolios that pass all four.
In-house AC power flow and DC screening replicate the studies that govern load interconnection.
FirmaOS forecasts accredited capacity (ELCC) for every generator, by season and as the grid mix changes.
Each ISO’s accreditation and deliverability rules are encoded in every run.
Portfolios are optimized to deliver competitive economics every time.
A Firma Portfolio Capacity Agreement, drawn from developer and IPP pipelines no single counterparty can match, delivered to your load through utility bring-your-own-capacity agreements, managed by Firma over the life of the contract. Your utility serves you; Firma supplies the capacity it needs.
FirmaOS checks deliverability and accreditation the way your utility will, before you commit.
One agreement with Firma replaces separate contracts with each developer and IPP.
Built to your utility’s bring-your-own-capacity rules, so your utility can serve you.
Firma tracks accreditation and secures replacement capacity as the grid mix shifts.
Four more short films show where the grid can deliver, how capacity is accredited, how cluster studies set upgrade costs, and how each market’s rules apply.
All five films and postsFirma supplies clean firm power that is deliverable to the load, approvable by the utility, and welcomed by the community. The structure is bring-your-own-capacity: a tariff pathway where dedicated Firma supply moves through the utility process instead of pulling from existing capacity.
A faster path to clean, quiet grid power, under one Portfolio Capacity Agreement.
Serve new large loads with dedicated supply, without new burden on existing customers.
Your project’s capacity is worth more inside a clean firm portfolio.
Data centers pay their own way, with clean, quiet power over the wires.
Firma is engaged with hyperscalers, AI cloud operators, developers, large industrials and utilities across MISO, SPP, and PJM, representing several gigawatts of load.